Deliverying Core Equipment for 600tpd Twin-Shaft Kiln Project, Showcasing Unbiased Solution Selection Subtitle: Milestone Shipment Reinforces Commitment to Providing Clients with the Most Suitable and Competitive Lime Calcining Technologies [Shijiazhuang, Jan 13, 2026] – the leading global provider of lime production solutions today announced the successful shipment of the core equipment package for a 600-tonnes-per-day (tpd) twin-shaft lime kiln project. This milestone highl
Traditional magnesium smelting processes typically use horizontal retorts or top-tapping methods, which suffer from high energy consumption and operational complexity. Our bottom-tapping technology optimizes the shaft furnace structure and reduction conditions, enabling efficient condensation and collection of magnesium vapor. Key advantages include: Since its commissioning, the production line has maintained stable operation, with product purity exceeding 99.95%,
Installation showing of 900 twin-shaft PFR kiln The 900tpd Twin shaft PFR kiln project of the northwest calcium carbide project undertaken by our company is being installed in an orderly manner. The first 600tpd twin-O PFR kiln using heat exchange tech independently completed by our company in China has been in operation for 13 years, with a refractory life of over 10 years, making it the long-est refractory life Twin-shaft PFR kiln on record in China. Exquisite design,
800tpd upgrading preheator rotary kiln successfully ignition In October 2024, the 800tpd rotary kiln energy-saving and carbon reduction process equipment project undertaken by our company was successfully ignited and achieved production standards. Compared with the equipment provided by a large state-owned enterprise before, the production capacity has increased by 20% and the production cost has been reduced by 10-15%, which has gained absolute recognition and appreciation from the
Our company personnel participated in the design and supply of key equipment for the transformation, upgrading, relocation, and renovation project of Xingtai Iron and Steel Group. The bottom plates of SRV furnaces 1 # and 2 # in the ironmaking area have been assembled, and the installation of furnace shells is in progress; 1 # and 2 # rotary kilns are ready for pouring; 1. The installation of dry dust removal equipment has been completed and handed over; The AD axis frame columns of the gas f
2x600tpd PRK in Middle Asia, working over design capacity EPS contract, all equipments were supplied by KayeEng. Kiln capacity 600tpdx2; Preheater rotary kiln, bes-t lime quality, T60 1min, upto 90℃ Stone crushing:500tpd: jaw crusher+twin roller crusher Vertical raymond mill+hydrator for non-ferro purpose Coal mill: 8tphx2 Worldwide Excellent mining and Lime kiln experts in KayeEng.