2x600tpd PRK in Middle Asia, working over design capacity EPS contract, all equipments were supplied by KayeEng. Kiln capacity 600tpdx2; Preheater rotary kiln, bes-t lime quality, T60 1min, upto 90℃ Stone crushing:500tpd: jaw crusher+twin roller crusher Vertical raymond mill+hydrator for non-ferro purpose Coal mill: 8tphx2 Worldwide Excellent mining and Lime kiln experts in KayeEng.
High-est efficiency twin roller crusher dispatch to Middle Asia clients Recently we dispatched twin roller crusher to Middle Asia clients, compared to other crushing system (like jaw-jaw, jaw-impact, jaw-hammer...), by using Jaw crusher and twin roller crusher, our client can get above 70-80% qualified size stone from the mine. High efficiency source utilization, low production cost, high IRR. The most wisdom bosses choice!!
3x600tpd Annular shaft kiln refractory overhaul The 2023 refractory overhaul task of Inner Mongolia XinZJ Co., Ltd. 1 # 2 # 3 # 600t/d annular shaft kiln (Bask. kiln), undertaken by our company, was successfully completed and put into operation with the strong support of the leaders and employees of XZJ Company.
Hot sale of second-hand cement plant of second-hand equipments. Except some items must be bought new ones, like refractory, EIC...; all other items could be recycled. Usually it will save around 1/3 investment cost. The bellow second hand cement kiln is 2500tpd clinker dry-type method. So call us today, will update you the latest machine list on hand.
Hot sale of second-hand lime kiln equipment with 1/3 of new one price KayeEng are selling all type lime kiln of second-hand equipments. Except some items must be bought new ones, like refractory, EIC...; all other items could be recycled. Usually it will save around 1/3 investment cost. The bellow second hand lime kiln contains (weight 800t): 8 pusher preheater 3.6x54m 3.8cooler China famous B
600tpd twin-shaft PFR kiln ignition On March 1st, our 600t/d twin-shaft PFR lime kiln project contracted by KayeEng company was ignited and put into operation, and the supporting public and auxiliary systems entered the thermal load commissioning stage. The project lasted for nine months. During the project construction, all nodes were completed on schedule and put into operation on time. The smooth operation of the project reflects the company's comprehensive strength, project